Traffic Intelligence

One junction,
three stages.

On Al Qudra Road in Dubai, near Arabian Ranches, a single roundabout decided how long every morning took. Dubai’s Roads and Transport Authority enlarged it, then replaced it with a flyover. The through-route is open and already carrying traffic, but the rest of the interchange is still being built. Watch what that did to the traffic - and to the city within reach.

The circular roundabout

Stage 1 · 2018-2025

Between 2018 and 2025, every weekday morning, all the traffic heading into the city from the south - Mudon, Arabian Ranches and the Sustainable City direction - funnelled through a single signalised roundabout that also had a second set of lights inside the circle. It could not keep up, and the result was heavy traffic: on a busy morning the four-lane approach backed up into long queues that ran well down the road, and the whole southern commute slowed to a crawl.

On a typical morning the tailback ran 350 to 550 metres. How long it took to get through came down to how many cars were ahead of you and how quickly the junction could clear them.

The egg

Stage 2 · mid-end 2025

In 2025, to make room for the new flyover, the junction was temporarily enlarged and reshaped into an egg. Counter-intuitively, mornings got worse, not better. The queue that used to clear in about 6 minutes now stretched to 8.5.

The flyover

Stage 3 · 2026

In 2026, the roundabout is gone. Through-traffic now flies over the junction on the flyover - no signal, no weave. Mornings still tighten for a few minutes at the very peak, and you might catch a short jam, but the long stop-and-go crawl is over. The junction is not finished yet: only the flyover through-route is open so far, while its other directions and the on and off ramps are still under construction.

With the through-movement grade-separated, the four lanes finally carry the demand - so nothing stacks up.

Time to clear the junction

Before · during · after

A bigger roundabout made it worse. Removing it fixed it - and gave roughly 6 minutes back to everyone heading into the city.

Dubai RTA puts the new bridge at 191% more junction capacity. A deliberate piece of planning turned a daily chokepoint into open road. Whether that new capacity is eventually eaten by induced demand is the longer question any fast-growing city has to weigh.

Six minutes, a wider city

The payoff · accessibility

Those minutes are reach. Heading northwest into the city, a 20-minute drive used to spend about 6 of them just clearing the bottleneck. Give them back and the area accessible within 20 minutes roughly doubles, while the number of job locations, shopping destinations and leisure almost triples.

Cyan is what a 20-minute morning drive reaches now; amber is how far the old bottleneck let you get in the same time.

The clock map

Read it as time

We do not really experience a city as distance - we experience it as time. This map redraws Dubai that way: every place keeps its true compass direction, but its distance from the centre now shows how long it takes to drive there, not how far away it is. Read it by the warp: the more a direction is stretched outward, the slower it is to travel, so places that look close on an ordinary map can actually be far once you measure them in minutes. In 20 minutes the old bottleneck only reached the amber ring; the flyover now carries you out to the larger one.

Concentric rings mark equal drive-time, so two places on the same ring are equally quick to reach whatever direction they lie in.

PerigonAI

Reading the city behind every intervention

The how and the why

PerigonAI fuses a continuously updated data lake - mobile-app location, connected-car telemetry, navigation-platform feeds, and live road-infrastructure data - into one measurement of how a city actually moves.

Mobile & app signalswhere people actually move, all day
Connected-car telemetryreal speeds and routes, lane by lane
Navigation platformsdemand and detour behaviour
Live road infrastructurethe network as it changes

With advanced modelling we measure, quantify, and explain urban mobility - its trends, its bottlenecks, and the real impact of every intervention, before and after it is built. The roundabout you just watched is one junction; we do this at the scale of cities.

PerigonAI delivers mobility and traffic geospatial intelligence for entire networks and cities - measuring how they move, finding where they break down, and quantifying the real impact of every change, before and after it is built.

Reach out to learn more →

The Al Qudra flyover is not finished yet. Its through-route is open, but the other directions and the on and off ramps are still under construction, so the full impact will need to be reassessed once the whole interchange is complete. Follow PerigonAI to see how it holds up.